Project Meeting Building
Work Scope:
Meeting Building construction with 15m span by 45m length, 2 floors dormitory, 2 floors apartment, dining hall, kitchen, toilet, landscape, drainage and concrete road pavement
Works include:
- Foundation: Piling and pile cap
- Reinforce Concrete Work: Ground beam, ground slab and first floor slab and roof beam & slab
- Steel Structure Work: Steel handrail, steel door, window grill, roof truss and roof tile
- Finishing Work: Interior & external block wall and plastering works and floor finish, wall painting finished, wooden door, aluminum glass door & window, tiling, stone work and terrazzo
Apostolic Vicar of Phnom Penh Center
1. Meeting Building
Location: St. Mong Rithy, Sangkat Phnom Penh Thmey Khan Sen Sok, Phnom Penh, Cambodia
Client: Bishop Olivier
Contract Duration: February 2013 ~ June 2014 (Complete)
Project Contract Value: $US 59,300.00