Project Apartment 6 Floor
Work Scope:
Labor Cost main contractor & MEPF work for apartment building 6 floors with PT slab and RC Frame include form setting, steel reinforcement and concreting, steel roofing, 1 underground water storage tank and pool
Works include:
- Foundation: Pile foundation Earthwork
- Reinforce Concrete Work: Pile cap, ground beam, ground slab GF, 1st Floor to 5th Floor column, roof beam and gutter and staircase
- PT Slab work: Shrinkage Reinforcement installation Formwork installation and removal for flat slab
- Steel Structure Work: Steel truss fabrication and erection for fibro-cement roofing
- M&E Work: Waste water pipe Clean water hot & cold piping Sanitary fixture
- Electrical: Lighting, switch, socket, data, telephone, fire alarm, MATV system
Apartment 6 floor
- Apartment building
- Pool
- Underground Water Tank
Location: Vihear Chen Village, Sangkat Svaydangkum, Siem Reap
Owner: Private
Contract Duration: 12 months
15 May 2016 ~ 30 Jun 2018
Project Contract Value: 9 months
$US 71,900.00