Project Siem Reap New Sub Station
Work Scope:
Sub-contract labor cost for structural work include form setting, steel reinforcement and concreting for control building 1000 Sq.m floor area, steel roofing, 1 underground oil separator tank, 1 underground water tank and 1 water tower 18m Height
Works include:
- Foundation: Pile foundation
- Reinforce Concrete Work: Pile cap, ground beam, ground slab GF, FF column beam & slab, roof beam and gutter and staircase
- Steel Structure Work: Steel truss fabrication and erection for fibro-cement roofing
Siam Reap New Substation
Control Building
Water Tower
Underground Water Tank
Underground Oil Separator Tank
Location: Khna Village, Sangkat Chreav, Siam Reap.
Owner: Cambodia Power Transmission Line Co., Ltd.
Contract Duration: Jul 2015 ~ Mar 2016
Project Contract Value: 9 months (Complete)
$US 65,000.00