Project Apartment 6 Floor

Work Scope:

Labor Cost main contractor & MEPF work for apartment building 6 floors with PT slab and RC Frame include form setting, steel reinforcement and concreting, steel roofing, 1 underground water storage tank and pool

Works include:

  • Foundation: ​Pile foundation Earthwork
  • Reinforce Concrete Work: Pile cap, ground beam, ground slab GF, 1st Floor to 5th Floor column, roof beam and gutter and staircase
  • PT Slab work: Shrinkage Reinforcement installation Formwork installation and removal for flat slab
  • Steel Structure Work: Steel truss fabrication and erection for fibro-cement roofing
  • M&E Work: Waste water pipe Clean water hot & cold piping Sanitary fixture 
  • Electrical: Lighting, switch, socket, data, telephone, fire alarm, MATV system

Apartment 6 floor

  • Apartment building​
  • Pool
  • Underground Water Tank

Location: Vihear Chen Village, Sangkat Svaydangkum, Siem Reap

Owner: Private

Contract Duration: 12 months
15 May 2016 ~ 30 Jun 2018 

Project Contract Value: 9 months
$US 71,900.00