Work Scope:

Sub-contract labor cost for structural work include form setting, steel reinforcement and concreting for control building 1000 Sq.m floor area, steel roofing, 1 underground oil separator tank, 1 underground water tank and 1 water tower 18m Height

Works include:

  • Foundation: ​Pile foundation
  • Reinforce Concrete Work: Pile cap, ground beam, ground slab GF, FF column beam & slab, roof beam and gutter and staircase
  • Steel Structure Work: Steel truss fabrication and erection for fibro-cement roofing

Siam Reap New Substation

Control Building
Water Tower
Underground Water Tank
Underground Oil Separator Tank

Location: Khna Village, Sangkat Chreav, Siam Reap.

Owner: Cambodia Power Transmission Line Co., Ltd.

Contract Duration: Jul 2015 ~ Mar 2016

Project Contract Value: 9 months (Complete)
$US 65,000.00